News & events
In this section you will find all the latest news of the Danieli Group. Selecting the categories below, you can see News, Records, Start-ups, New Orders.
plants startup
2024, 12th September
Six Danieli Zerobucket EAFs started up in China in the last two months
They all feature original, continuous scrap charging, ensuring low-carbon emissions and energy savings, and Q-Reg
The Zerobucket EAF installations of Qiananshi Jiujiang (two units), Zhejiang Yuxin, Heyuan Derun, Baoshan I&S, and Baosteel Xinyu have been started-up during the last two months by Danieli China. Additionally, the Zerobucket EAF of Hebei Puyang is in cold-test phase, and it will be also in operation soon.
These electric-arc furnaces have capacities ranging from 210 to 330 tph.
Danieli Zerobucket EAFs are the most flexible melting units, allowing a wide range of charge mixes such as hot metal, DRI, HBI and scrap.
They can work with up to 80% of hot-metal charge replacing BOF converters and obtaining outstanding results in terms of short tap-to-tap time, boosting the overall steelmaking plant productivity.
The seven furnaces are managed by Danieli Automation systems, including advanced electrode regulator Q-Reg with melting profile optimization. Danieli process control systems facilitate furnace startups and enable quick performance achievements.
The two Zerobucket EAFs just started at Qiananshi Jiujiang are part of a package order of four units from the customer.
The Zhejiang Yuxin installation features the first Danieli-patented Tornado scrap conveyor system with variable cross-section that allows the best pre-heating results with different scrap types available from the market.
Danieli received 29 Zerobucket EAF orders from China since 2018, 19 of which are in operation –for a market share of more than 70% of projects carried out by main technology suppliers.
- Francesco Cragnolini
- f.cragnolini@danieli.com
- +39 3884249740